10.03.2014

Living Home Planned for Taylor’s Mistake

New Zealand’s first “Living Building” home will soon be underway at Taylor’s Mistake in Christchurch.

Architectural designer Craig Jarvis is building the home for his family in accordance with the principles of the Living Building Challenge (LBC).

In accordance with LBC principles, it is Jarvis’s goal to achieve perfect harmony between environmental impact, economy and beauty.

The small but efficient 88 square metre home will be “triple net zero” in terms of water, waste and energy. Curved laminated beams, and an extensive green roof will cloak the home, and a modular portable kitchen will allow cooking inside and outside.

It is expected that Abodo’s Sand Decking will be used on the exterior deck area. More than 150 Living Buildings have been built around the world, but only one has been completed in New Zealand – a commercial building, designed by Jasmax for the Tuhoe Iwi.

Abodo Wood had significant involvement with the Tuhoe build – supplying Cladding and Decking, along with FSC® certified radiata pine clearwood for the interior.

Recent news

Scarborough Cliffhanger Vantage Point House Vulcan Timber Abodo Wood 05

From Design to Delivery: Abodo Welcomes Weaverbird Wood Co

Abodo® Vulcan is now available through Weaverbird Wood Co, giving California’s architecture and design community a new way specify high-performance timber.

Read more
Coatesville Entertainer Vulcan Cladding Abodo Wood 09

NEW / Enhanced Protector™ Formulation

An enhanced Protector coating formulation, is being rolled out. Factory coating of the new Protector in Patina, Teak, Straw, Nero, Natural, Walnut, White, and Clear is now happening.

Read more
Te Toka Vulcan Screening Abodo Wood

Introducing / The Mountain Wests' Glacier Millworks

A new distributor in Abodo’s North American Architectural partner network.

Read more
Abodo Cabins 75mm Cladding Screw Abodo Wood 01

Built on Feedback: The New 75mm Cladding Screw is Coming

Responding to customer demand for greater fixing depth, builders will get an extra 10mm where they need it most. Replacing the 65mm, the new 75mm Cladding Screw is arriving in September 2026.

Read more