04.04.2023

NZ Lead Times Reduced to 6 Weeks for Main Vulcan Product Lines

Lead times for Vulcan Cladding, Screening and Panelling are now down to 6 weeks.

Down from 8-10 weeks, lead times for our main Vulcan lines of Vulcan Cladding, Screening and Panelling are now 6 weeks.

Here are the current lead times across all our cladding and decking lines, from the time of order:

Cladding:

Decking

  • Vulcan Decking (Uncoated) - 2 weeks
  • Vulcan Decking (Coated) - 6 weeks
  • Sand Decking - 6 weeks

Screening:

  • Vulcan Screening - 6 weeks

Walls and Ceilings:

A reminder, all our products, including top ups, are available to order now from your local New Zealand timber merchant.

Please contact our Sales Support team on 09 249 0100 or by email with any questions.

Recent news

Scarborough Cliffhanger Vantage Point House Vulcan Timber Abodo Wood 05

From Design to Delivery: Abodo Welcomes Weaverbird Wood Co

Abodo® Vulcan is now available through Weaverbird Wood Co, giving California’s architecture and design community a new way specify high-performance timber.

Read more
Coatesville Entertainer Vulcan Cladding Abodo Wood 09

NEW / Enhanced Protector™ Formulation

An enhanced Protector coating formulation, is being rolled out. Factory coating of the new Protector in Patina, Teak, Straw, Nero, Natural, Walnut, White, and Clear is now happening.

Read more
Te Toka Vulcan Screening Abodo Wood

Introducing / The Mountain Wests' Glacier Millworks

A new distributor in Abodo’s North American Architectural partner network.

Read more
Abodo Cabins 75mm Cladding Screw Abodo Wood 01

Built on Feedback: The New 75mm Cladding Screw is Coming

Responding to customer demand for greater fixing depth, builders will get an extra 10mm where they need it most. Replacing the 65mm, the new 75mm Cladding Screw is arriving in September 2026.

Read more